hyve logo
Home
work
Services
Case Studies
Blog
Robotics
Freebies
About
contact

Exhibiting at

LogiMAT? ProMat? Automate? MODEX? IREX? LogiMAT?

Your events have a fixed start date. Your content, brochures & brand films should have one too.

7 content tracks12-week run-up
Get a booth content planSee the seven deliverables →

Since 2018

We have been making product films, CGI explainers and brand work for the robotics and automation companies that exhibit at these shows. The machines on this page are the ones we already know how to rig, light and animate.

See the robotics work →
AddverbGreyOrangeUnbox RoboticsNGK CeramicsSamsung DesignNational GeographicBBC StoryWorks

The exhibition content playbook

12 weeks out is not early. It is the last comfortable moment.

A 90-second product film takes six to eight weeks, which is why film starts at week 12 and gates everything behind it. Backwall artwork has a print release date that cannot be pushed. Brochures need freight time. Booth media freezes a week out whether your file is ready or not. Seven tracks, one calendar, and the first one starts sooner than you think.

Five dates that cannot move

Week 12

CAD + spec handover

Every film downstream is built on this. Hand it over late and the slip is not one week, it is the whole animation and grade sequence.

Week 7

Booth CAD + dielines

No dielines, no backwall artwork. Your stand builder cannot start, and the print queue does not care why.

Week 3

Print release

Irreversible. Once artwork goes to press, a wrong dimension or a stale spec costs a reprint — and a reprint costs the show.

Week 1

Booth media freeze

Screens are loaded and tested on site. Whatever is not delivered by this date simply does not play on your stand.

+72 hours

Recap live

The short window where the people who walked your stand still remember it. Miss it and the leads go cold before the follow-up lands.

Working backwards

Pick your show. Get your real dates.

The five gates above are the ones that cannot move. Below is the full working set as actual calendar dates, counted back from the opening morning of the show you are exhibiting at. The irreversible ones are marked.

LogiMAT 202716–18 March 2027 · Messe Stuttgart
Hannover Messe 20275–8 April 2027 · Messe Hannover
ProMat 202719–21 April 2027 · McCormick Place, Chicago
Automate 202710–13 May 2027 · Las Vegas Convention Center
automatica 202722–25 June 2027 · Messe München
IREX 2027December 2027 · Tokyo Big SightDates not yet published
MODEX 2028Spring 2028 · AtlantaDates not yet published

Dates as published by the organisers and correct at the time of writing. Confirm against the official show site before you book freight or release artwork to press.

Seven deliverables. Seven different deadlines.

Each track has its own lead time and its own failure mode.

Replace · Hero exhibition film · 16:9 video or still
Start by week 12 · 6–8 weeks

01 · Exhibition film

The hero film for the main wall, plus a silent booth loop cut to your LED's native resolution. 60–90 seconds, 16:9 aspect ratio.

If it slips: the biggest screen you are paying for has no anchor, and every social teaser cut from its rushes slips with it.

Replace · Product film per SKU · 16:9 video or still
Start by week 12 · 6–8 weeks

02 · Product films

One 45–60 second film per hero SKU, two to three produced in parallel in 4K, CGI or hybrid. Plus a three to four minute sales reel that lives offline on every tablet on the stand.

If it slips: your sales team demos from a phone gallery, and the SKU you came to launch has nothing to show.

Replace · CGI explainer or kiosk demo · 16:9
Start by week 10 · 4–6 weeks

03 · Product explainers

Technical CGI explainer, 60–120 seconds in 4K with callouts and voiceover plus a silent cut.

If it slips: your engineers answer the same mechanism question forty times a day instead of qualifying buyers.

Replace · Backwall or stand render · 16:9
Print release by week 3 · irreversible

04 · Backdrop designs

Backwall, panels, fascia, totem, counter and floor, built to your stand builder's dielines. 150dpi at 100%, CMYK, with text kept above the one-metre sightline.

If it slips: you miss the print queue. This is the one deadline where late costs money rather than time.

Replace · Reel, carousel or teaser · 9:16 or 1:1
Teasers live from week 6 · 2–3 weeks

05 · Social creatives

Six pre-event teasers with booth number and hall in frame, three carousels, four 9:16 reels cut from film rushes with the hook inside two seconds, and a live-from-booth kit for the team on the stand.

If it slips: you arrive at a show nobody knew you were attending, and walk-ups replace booked meetings.

Replace · Signature strip and banner set · 16:9
Live by week 6 · 3 days

06 · Email signatures & banners

Signature strip at 600×120 @2x under 100KB with a UTM link, plus email headers, LinkedIn and web banners. Every outbound surface you already own, carrying the booth number and hall.

If it slips: nothing visibly breaks, which is exactly why it never gets done. It is also the cheapest reach you will buy all quarter.

Replace · Brochure spread or one-pager · 16:9
Copy locked by week 8 · 4 weeks to press

07 · Brochures

Flagship four-page brochure at 300dpi CMYK — A4 for the European and Japanese shows, US Letter for ProMat, MODEX and Automate — plus per-SKU one-pagers carrying specs, dimensions and certifications, and a digital leave-behind with a QR code on the stand. Or skip paper altogether and put an interactive experience on the tablets, which does the job the brochure was only pretending to do.

If it slips: freight closes. Printed brochures that arrive after the show are a cost with no return. Your tablet kiosks stay unattended, often stuck playing videos you would rather have playing on your main display.

Scope and pricing

Three ways to arrive ready.

Each tier builds on the one before it. Pick by how much of the stand you need covered and how much runway you have left. If your show is closer than the lead time, skip to Show Salvage below — it exists because that is the most common call we get.

Stand Ready

The minimum a stand needs so the screens are not empty.

From USD 6,000
6–8 week runway
  • Hero exhibition film:  60 - 90s, 16:9
  • Booth LED loop: 20–30s, seamless and silent, native resolution
  • Main backwall artwork: CMYK, PDF/X-1a
  • Four panels built to your stand builder's dielines
  • Email signature strip and two banners
  • Delivery in every booth playback format
Start here →
Most popular

Show Complete

Everything on the stand, plus the run-up that fills it.

From USD 14,000
8–10 week runway

Everything in Stand Ready, plus:

  • Two to three product films, one per hero SKU, in 4K
  • Technical CGI explainer with callouts, VO and a silent cut
  • Kiosk tap-through:  offline, landscape, 60s idle auto-reset
  • Six pre-event teasers, three carousels, four 9:16 reels
  • Flagship brochure and three product one-pagers
  • Full panel, fascia, totem, counter and floor set
Get a plan →

Full Campaign

The whole calendar, run to the gates, through to follow-up.

From USD 24,000
12 week runway

Everything in Show Complete, plus:

  • Sales reel for tablets: offline copy on every device
  • Live-from-booth kit with same-day captures and captions
  • Post-show recap film live within 72 hours
  • Post-show cutdowns and the follow-up mail set
  • Digital leave-behind under 8MB with booth QR
  • One producer holding all seven tracks and every gate
Talk scope →

Indicative ranges for a robotics stand, scoped per show. Final cost depends on SKU count, how much geometry needs building from scratch, and how many surfaces the stand carries. One approver per track is assumed; each extra review round adds a week.

Late runway

Show in less than eight weeks?

Most of this page assumes twelve. If you have six, or four, you are the person we can move fastest for — and the honest answer is not no, it is less.

Rush lane

Show Salvage

What is still deliverable once the runway has gone.

From USD 3,500
3–5 week runway
  • Backwall and panel artwork, if dielines already exist
  • Silent LED loop cut to your pixel map from footage you own
  • Six teasers and four 9:16 reels from existing rushes
  • Email signature, banner and booth-number set, live in days
  • Digital leave-behind under 8MB with a booth QR — no freight
  • Live-from-booth kit so the team can shoot and post on the stand
Tell us the date →

What we will not promise you

  • New CGI product films. Six weeks is the floor, and a render and grade queue does not compress because the show is close.
  • Printed brochures once freight has closed for your hall. A brochure that lands after the show is a cost with no return.
  • Backwall artwork with no dielines. We cannot design to a stand nobody has drawn yet.

If your show opens inside three weeks, write to us directly rather than filling in the form — at that range the first question is what is already shot, and that is a conversation, not a brief.

Your side of the calendar

Six things only you can hand over.

None of it takes long. All of it gates something downstream, which is why every slipped project we have seen slipped here and not in production.

Week 12

CAD and spec, per SKU

STEP or native geometry, plus the spec sheet the film has to stay honest to. If the kinematics are unusual, a short call with your mechanical lead saves a week of guessing.

Week 12

Brand kit and existing footage

Logo files, type licences, colour references, and any footage or renders already sitting on a drive. Reuse is the cheapest week you will ever buy back.

Week 7

Booth CAD, dielines and pixel map

From your stand builder. We need the LED's real pixel dimensions, not an assumed 16:9, and the furniture plan so nothing important sits behind a counter.

Week 12

One approver per track

Named, not a committee. Consolidated feedback in one pass. Each extra review round adds a week, and at week 3 there are no weeks left to add.

As soon as you have it

Booth number and hall

Every teaser, signature strip and banner carries them. Without them the social run-up drives people to a show rather than to your stand.

Week 12

What is under embargo

Which SKUs cannot be seen before the show opens, what can appear in silhouette, and when the embargo lifts. This shapes the whole social calendar.

Before you ask

The questions exhibitors actually ask.

Our show is in six weeks. Are we too late?

Not for everything. Backwall artwork, an LED loop cut from footage you already own and the full social kit are all still deliverable. New CGI product films are not — six weeks is the floor and a render queue does not compress. See Show Salvage above.

We already have a product film. Can you use it?

Usually. Most existing films need a regrade, a reframe to your LED's actual aspect ratio and a silent cut before they hold a stand. That is days rather than weeks, and it frees budget for the tracks you do not have yet.

Our stand builder handles the artwork.

Then we build to their dielines and hand back print-ready PDF/X-1a at 150dpi at 100 percent. We would rather work with your builder than around them; they own the structure, we own what goes on it.

Do we need German or Japanese versions?

For LogiMAT, Hannover Messe, automatica and IREX, yes — at minimum burned-in subtitles and localised brochure copy, because the hall is too loud for audio to carry anyway. We handle subtitle timing, VO direction and the layout reflow that longer German strings force.

Who owns the files?

You do, on final payment — masters, project files and layered artwork. We keep a working copy for the recap cut and ask before showing anything publicly.

Our robot is unreleased.

Standard for this industry. We work under NDA and routinely build and animate geometry that stays on our machines until your keynote. Tell us at week 12 which SKUs are embargoed and what can be shown in silhouette.

Will it match our brand guidelines?

Yes. Send the kit at week 12 and everything is designed to it from the first frame, rather than corrected into it at week 3 when there is no time left to correct anything.

Where are you based?

Delhi. We work to European, US and Japanese show calendars, and the gate dates on this page are the ones we hold ourselves to. Reviews run on your working hours, not ours.

Tell us the date

Which show, and how long have you got?

Send us the show and the opening date. We map your seven tracks onto a working-backwards calendar, tell you honestly what fits in the runway you have left, and come back with a scoped plan within two working days.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Have a product, service or technology that needs explaining?
Let's
Talk      
Sitemap
homeworkServicesCase StudiesBlogRobotics Freebiesaboutcontact
social
instagramYoutubeLinkedIn
©
2026